Our team from Men in Sheds have completed the replacement of an existing timber shed for the Greatfield Park Primary School. This involved dismantling an old timber shed and building a replacement tin shed.
![Timber Shed for Dismantling](https://meninsheds-cheltenham.org/wp-content/uploads/2022/05/school0.jpg)
Original Timber prior to dismantling
![Dismantled Shed](https://meninsheds-cheltenham.org/wp-content/uploads/2022/05/school3.jpg)
Greatfield School dismantled shed
![Repacement Metal Shed Greatfield School](https://meninsheds-cheltenham.org/wp-content/uploads/2022/05/school4.jpg)
New Metal Shed Greatfield School
The most difficult part of constructing the new shed was moving it’s heavy metal base into position, this involved a lot of physical effort by a group of people from the school staff and the men in sheds team working together.